Construct Post-Thinkbelt
The project is located in the Mpumalanga Province, which is the main coalfield area in South Africa. The area is around the biggest power station-Eskom Kendal Power Station- in the South Africa.
Coalfields usually have a close connection with thermal power stations, between two of the major infrastructures there is a systematic transportation network. 80% of power stations in South Africa are coal-fired and most of them will be retired in the following 50 years.